2023年1大学英语六级考试阅读理解及答案(1)

雕龙文库 分享 时间: 收藏本文

2023年1大学英语六级考试阅读理解及答案(1)

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. Which of these statements is TRUE of system building?

  A. It employs more men.

  B. It is difficult and dangerous.

  C. It can save both time and money.

  D. It means less mechanization.

  2. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. What lifts the concrete panels onto the building?

  A. Cranes.

  B. Man-power.

  C. Pulleys.

  D. Hydraulic jacks.

  5. The usual fixed length in the modular system is_______.

  A. twenty centimeters

  B. ten millimeters

  C. fifty centimeters

  D. ten centimeters

  参考答案:

  1. C 2.A 3. B 4. A 5. D

  

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. Which of these statements is TRUE of system building?

  A. It employs more men.

  B. It is difficult and dangerous.

  C. It can save both time and money.

  D. It means less mechanization.

  2. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. What lifts the concrete panels onto the building?

  A. Cranes.

  B. Man-power.

  C. Pulleys.

  D. Hydraulic jacks.

  5. The usual fixed length in the modular system is_______.

  A. twenty centimeters

  B. ten millimeters

  C. fifty centimeters

  D. ten centimeters

  参考答案:

  1. C 2.A 3. B 4. A 5. D

  

雕塑 信息流广告 竞价托管 招生通 周易 易经 代理招生 二手车 剧本网 网络推广 自学教程 招生代理 旅游攻略 非物质文化遗产 河北信息网 石家庄人才网 买车咨询 河北人才网 招生考试 精雕图 戏曲下载 河北生活网 好书推荐 工作计划 游戏攻略 心理测试 石家庄网络推广 石家庄招聘 石家庄网络营销 培训网 好做题 游戏攻略 考研真题 代理招生 心理咨询 游戏攻略 兴趣爱好 网络知识 品牌营销 商标交易 游戏攻略 短视频代运营 张家口人才网 秦皇岛人才网 PS修图 宝宝起名 零基础学习电脑 电商设计 职业培训 免费发布信息 服装服饰 律师咨询 搜救犬 Chat GPT中文版 语料库 范文网 工作总结 二手车估价 短视频剪辑 情侣网名 爱采购代运营 保定招聘 黄金回收价格 情感文案 吊车 古诗词 邯郸人才网 铁皮房 衡水人才网 石家庄点痣 微信运营 养花 名酒回收 石家庄代理记账 女士发型 搜搜作文 石家庄人才网 铜雕 关键词优化 围棋 chatGPT 读后感 玄机派 企业服务 法律咨询 chatGPT国内版 chatGPT官网 励志名言 儿童文学 河北代理记账公司 风水运势 狗狗百科 教育培训 游戏推荐 抖音代运营 朋友圈文案 男士发型 培训招生 文玩 大可如意 保定人才网 沧州人才网 黄金回收 承德人才网 石家庄人才网 模型机 高度酒 沐盛有礼 公司注册 十亩地 造纸术 唐山人才网 沐盛传媒 铜雕厂家